does anyone know if I can start my IC40 SWG before the 30 day wait time shown on page 17 of the user's guide? I have Rev G of the manual. Perhaps there has been a change in the manual.
lbridges belives that this requirment is for Plaster pools only. see this
(vancouver-wa-pool-resurrection-t23335.html)
Anyone?
lbridges belives that this requirment is for Plaster pools only. see this
(vancouver-wa-pool-resurrection-t23335.html)
Anyone?