- Apr 18, 2010
- 49
Hi All,
Saturday our pool was plastered with a quartz aggregate (maui gem).
According to the plaster co (pyramid concrete) we can begin to add chlorine starting day 3.
Since we want to go in the pool this weekend, i think i'd like to do this tomorrow!
I checked the pool calculator and for an FC increase from 0.1 to 4.0 it said to add 210oz of 6% bleach.
Based on my reading, looks like it is best to dilute ~10:1 in water....so if i were to add 1/2 gallon of chlorine bleach to 4.5 g pool water in a 5g bucket and repeat this procedure until all 210oz were added would i be ok?
Assume it is best to pour over the deepend, avoid sides, etc....i dont want to stain/interefere with the plaster.
Does this sound ok or should i follow a different procedure?
Many thanks!!!
Saturday our pool was plastered with a quartz aggregate (maui gem).
According to the plaster co (pyramid concrete) we can begin to add chlorine starting day 3.
Since we want to go in the pool this weekend, i think i'd like to do this tomorrow!
I checked the pool calculator and for an FC increase from 0.1 to 4.0 it said to add 210oz of 6% bleach.
Based on my reading, looks like it is best to dilute ~10:1 in water....so if i were to add 1/2 gallon of chlorine bleach to 4.5 g pool water in a 5g bucket and repeat this procedure until all 210oz were added would i be ok?
Assume it is best to pour over the deepend, avoid sides, etc....i dont want to stain/interefere with the plaster.
Does this sound ok or should i follow a different procedure?
Many thanks!!!