i am opening my pool for the first time on friday, i have a chlorinater w/ 3" tabs left over, i was told to put 3 at a time in is that about right (pool info in sig). do i load the tabs at the same time i start to shock the pool?
or should i bypass the filter and circulate the shock first for a day or so, and then go to the filter? i just dont know
or should i bypass the filter and circulate the shock first for a day or so, and then go to the filter? i just dont know