Hi Guys, Love the site..
I will be receiveng my kit this week and I have seen several posts regarding the difficulty of keeping the wedding cake steps free from alge buildup. I am about to be a proud owner of a set. I was speaking with my husband last night about the possibility of taking a small drill bit and drilling a few holes in the strucutre to aid in the flow of water through the steps. I guess to make a long stroy short, I am not exactly sure how thick the step walls are and I don't want to do anything to jeapordize the integrety structure. All of the pics I have seen of the steps are of the same lady chilling on the top step, she can sell them but offers no real info about the structure itself. Guess I had this one coming since I didn't get with my salesman on it. Any opinions on if this would be a good idea or not?
I will be receiveng my kit this week and I have seen several posts regarding the difficulty of keeping the wedding cake steps free from alge buildup. I am about to be a proud owner of a set. I was speaking with my husband last night about the possibility of taking a small drill bit and drilling a few holes in the strucutre to aid in the flow of water through the steps. I guess to make a long stroy short, I am not exactly sure how thick the step walls are and I don't want to do anything to jeapordize the integrety structure. All of the pics I have seen of the steps are of the same lady chilling on the top step, she can sell them but offers no real info about the structure itself. Guess I had this one coming since I didn't get with my salesman on it. Any opinions on if this would be a good idea or not?