Become a TFP Supporter Pool Math Forum Rules Pool School
Results 1 to 2 of 2

Thread: Closing AGP for first time with SWG and hard plumbed piping

  1. Back To Top    #1

    Join Date
    Jan 2010
    Location
    Randleman,NC
    Posts
    620

    Closing AGP for first time with SWG and hard plumbed piping

    Suggestions on the best way to winterize equipment since will not be removing for storage this year.Also in North Carolina so our winters are short.In the past I have Raises Chlorine and lowered water and cover pool.Would pull and store pump.

    Leasure bay AG 24ft,52 in high.installed June of 1999. Hayworth S-180 T sand filter/Power-Flo Matrix 1horse 2 speed pump /Aqua Trol SWG/Using TF-100 Test Kit

  2. Back To Top    #2

    TFP Guide

    Catanzaro's Avatar
    Join Date
    Jul 2014
    Location
    Monmouth County, New Jersey
    Posts
    2,187

    Re: Closing AGP for first time with SWG and hard plumbed piping

    If you blow out the lines, water will be removed from the Sand Filter and pump, including the plumbing lines. Here is information on the Sand Filter:

    winterizing with a sand filter

    Post # 11 (although recommend reading the whole post)
    14,700 gallons IG Pool Vinyl Liner - Octal Circulation System
    Hayward Pro-Series 350 LB. Sand Filter Model # S270T - 2" Plumping
    Hayward CL2002 Chlorinator - Hayward Super Pump 2 HP Model # k48m2n111
    Hayward AQR9 SWG 25K Salt Cell & TF-100 Test Kit + Speed Stir
    Gulfstream HE125RA - 117K BTU Heat Pump - Date of Build is 11-2013

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •