Dewatering pool for three days on a well. Advice!!

Jul 21, 2016
32
New Smyrna fl
Our pool needed debris dugout and backfilled with rock after hiting water. They have a pump hooked up into the rock with our hose running into the rock pumping out water. They are almost done rebar and pool isn't shot until Friday. They want the pump running until then with my well pump running the whole time. What should I do?

- - - Updated - - -

If turned off they said it could cave the pool in. They dug 10ft backfilled with rock to 6.6
 