2cd time around ...when we first filled our Intex Ultra Frame it was insanely unlevel.. within a day it started to tilt with a 4 inch difference... So I called it over my husband and we drained it.. Yesterday my neighbor came up and tilled the high side. We live in Nevada so the ground is exceptionally hard. However after getting it back up and working on it for hours here is where we are at 75% is off by 1 inch if that I have 25% almost 2 inches not quite .... do we have to drain? Or will we survive ? It's the 14ft by 42 inches- thanks in advance..