Hi All,
Our pool build starts on Thursday! We signed the contract in May, but it took a month to get the HOA approval. The excavators will be here on Thursday! The family is super excited, but a little apprehensive about the mess in the yard for the next 45-60 days!
Our pool:
80 perimeter
Roughly 30x15 freeform
400 sqft with 3.5-6' depth
Tanning ledge with 2 bubblers
Bench in deep end
One 500W light
325 sqft deck (attached to 100 sq ft existing patio)
Raised beam on one side with 1 32" scupper (2x8' 6" high sections and 1x7' 12" high section with scupper)
Travertine coping and acrylic deck
Ultra UV sanitizer
60% quartz interior w/ 7 yr warranty
This will be our first in-ground pool (had an above ground a few years back in our previous house), so it's pretty exciting! Hoping to learn from the veterans on here!
Thanks.
Ro
Our pool build starts on Thursday! We signed the contract in May, but it took a month to get the HOA approval. The excavators will be here on Thursday! The family is super excited, but a little apprehensive about the mess in the yard for the next 45-60 days!
Our pool:
80 perimeter
Roughly 30x15 freeform
400 sqft with 3.5-6' depth
Tanning ledge with 2 bubblers
Bench in deep end
One 500W light
325 sqft deck (attached to 100 sq ft existing patio)
Raised beam on one side with 1 32" scupper (2x8' 6" high sections and 1x7' 12" high section with scupper)
Travertine coping and acrylic deck
Ultra UV sanitizer
60% quartz interior w/ 7 yr warranty
This will be our first in-ground pool (had an above ground a few years back in our previous house), so it's pretty exciting! Hoping to learn from the veterans on here!
Thanks.
Ro