New to this forum, and pools (first year), but have a question.
Bought a house with what looks like a pool that was built in 1994. The liner is VERY bad (pretty much bleached), and the current water in it (maybe 4-5 feet in the deep in), in disgusting.
I have ordered to have it measured on Monday to be fit for a new liner, and the liner will be installed 3-4 weeks after that.
The pool guy said the pool must be emptied for them to measure (or the water must be clean, but its really dirty right now).
Will there be any issues if I empty the pool, and leave it empty for 3-4 weeks, keeping in mind its to get a new liner installed?
New to this forum, and pools (first year), but have a question.
Bought a house with what looks like a pool that was built in 1994. The liner is VERY bad (pretty much bleached), and the current water in it (maybe 4-5 feet in the deep in), in disgusting.
I have ordered to have it measured on Monday to be fit for a new liner, and the liner will be installed 3-4 weeks after that.
The pool guy said the pool must be emptied for them to measure (or the water must be clean, but its really dirty right now).
Will there be any issues if I empty the pool, and leave it empty for 3-4 weeks, keeping in mind its to get a new liner installed?