Hey y'all. As I mentioned in my intro thread not long ago, we bought a new house and with that became new pool owners. While I worked on inside projects I had a pool maintenance guy get the pool ready. He shocked it and got all the levels right. I just received my TF-100 kit this week and did the tests for the first time myself today. It's been about 10 days since he said it was ready. Here are the results.
FC=6.5
CC=1
TC=7.5
CH=250
TA=130-140 (had two drops squeak out on the last one)
CYA=40-50 (40 by the fiancé and 50 by me)
Aqua Check strips said 3360 ppm salt
pH approx. 7.8
Based on the instructions, seems to me that the total alkalinity is a little high. Somebody with experience want to give a little briefing on analyzing the results and what steps of any to take?
FC=6.5
CC=1
TC=7.5
CH=250
TA=130-140 (had two drops squeak out on the last one)
CYA=40-50 (40 by the fiancé and 50 by me)
Aqua Check strips said 3360 ppm salt
pH approx. 7.8
Based on the instructions, seems to me that the total alkalinity is a little high. Somebody with experience want to give a little briefing on analyzing the results and what steps of any to take?