Hey everyone! We finally have our permit and the digging starts tomorrow at 7:30am. We're doing a 100' perimeter free-form with 7' diameter spa. Big Baja shelf with umbrella sleeve (still debating on depth, 6-9"?), pool depth ranges from 3.5'-6'. All Pentair equipment except the remote which is Jandy. Mini pebble for the surface, though I'm actually not a huge fan of it. Thinking about good old plaster. Any other suggestions?. I also splurged on gas tiki torches. We're really excited. Last minute advice? We're in the San Fernando Valley of Los Angeles. Thanks!