    Has anyone hit rock during excavation and if so how costly was it? Our neighborhood has big rocks underground...they stack them along the streets when building new homes. The excavator mentioned to me that he knows my area has rock and it can get expensive quick if they hit it.
    18 x 38 gunite, 39-7 deep, 8 x 12 tanning ledge with 8 deep water, umbrella sleeve, 2 LED bubblers.
    2 Pentair LED lights, 16 long fiberglass hill slide and jump rock. Sand dune pavers/coping. TF-100. My build: Georgia Pool Build.... No Longer O/B :))

  2. Back To Top    #2
    Helen203's Avatar
    Join Date
    Jul 2015
    Location
    Annapolis, MD
    Posts
    813

    Re: Hitting Rock (Excavation)

    Hopefully Jamie will weigh in -- her yard was like Bedrock from Flintstones era!
    My Pool Build (2015): inground 12K gals gunite/plaster pool, SWG, 2-speed pump, cartridge filter, gas heater, and polaris cleaner (Jandy). TF-100 Test Kit w/ Speed Stir

  3. Back To Top    #3
    Isaac-1's Avatar
    Join Date
    May 2010
    Location
    SW Louisiana
    Posts
    6,711

    Re: Hitting Rock (Excavation)

    The topic comes up from time to time, when it is hit the big question becomes is it small enough to remove, and is not can you redesign the pool to go around it.
    Indoor 20x40 35,000 gallon vinyl pool with 1.5 HP 2 speed Jandy FloPro pump, Hayward EC75 Perflex DE filter, 11 4x12 Techno-Solis solar panels w/ Aquasolar controller, Aquabot Turbo T Robot Cleaner. Also LMI metering chlorine dispenser pump and HotSpring Jetsetter
    I use and endorse TFtestKits TF-100 from http://tftestkits.net
    ~Remember TFP counts on your donations to keep this site ad free~

  4. Back To Top    #4
    ellsian's Avatar
    Join Date
    Jun 2014
    Location
    Peoria, AZ
    Posts
    216

    Re: Hitting Rock (Excavation)

    This is relatively common in Arizona depending on how close you are to the mountains. We don't so much have boulders of rock, just more like rock layers known as Caliche. It's called a "hard dig" over here, and I was told it can range from $1500 - 5000 extra Not sure how much something like that would be in GA.
    Swim ready :) My Pool Build Thread. IG shotcrete 34x16 Grecian shape. 22k gallons. 3'6 - 8'6 deep. 12x5 Baja ledge w/ 2 Bubblers, 14' raised beam sheer descent waterfall in stacked rock. Custom stone diving board. Hayward sand filter, VS pump, Aquarite T-15 SWCG. A&A In floor system w/ Gamma 4 venturi heads, Blue surf Pebble sheen, Colorlogic LED. Future Travertine Sandcastle Owner.

  5. Back To Top    #5
    JamieP's Avatar
    Join Date
    May 2011
    Location
    Waxahachie, TX (south of Dallas)
    Posts
    1,135

    Re: Hitting Rock (Excavation)

    We knew to expect rock (limestone) right under the surface when we dug our pool. What we didn't know is if we'd hit the "blue rock" under the limestone that is even harder to get through. The excavators around here charge a base price for the pool depending on its size, then an hourly rate (typically $250/hour) once they need to start using the rock hammer. The guy I went with instead charged by the volume of rock he had to haul off, which was a more definite amount based on the pool size instead of an open ended amount of time, and I liked that. He was actually the excavator I felt was the most experienced and the one I had most confidence in, so that helped too. In the end, though, if I were to have calculated the hours vs the price for what he had to haul off, it worked out pretty comparable, since we did end up hitting the blue rock and it was very very hard and took a long time to get through.

    The cost of excavation was pretty steep for us because of the rock, but there was no getting around it, and we factored it into our budget. The hard part is the not knowing so not being able to budget well, but we knew what to expect and had a worse case scenario factored into our budget.

    One thing I also had to consider was what to do with the rock. Since we were O/B and my excavator wasn't local to my area, he wasn't familiar with where to dump it. Supposedly it's easy to find people who want good fill dirt, but not everyone wants your rock! If you have a PB then they will figure that out for you, but I had at least one excavator that didn't want to deal with me because it was too much trouble figuring out what to do with the rock. My excavator said he'd call around, but I decided to be proactive and tracked down my own place to dump sooner than he probably would have gotten to it. It all worked out in the end, fortunately.

    Good luck! I hope for your sake all the rocks in your area decided to take up residence in your neighbors' yards instead of yours!
    28,000 gallon freeform, Stonescapes Tropics Blue Minipebble with abalone, 3.5' to 8.5' depth. 2 skimmers, 5 returns, dedicated vacuum port, Dolphin Z5 robot. All Pentair equip: EasyTouch 8, IC60 SWG, VS pump, 520 Cartridge Filter, 3 Intellibrites, 2 Color Cascade Bubblers. TurboTwister Slide and 8' Salt System Jump Board. TF-100. My Jan-Mar 2016 build:
    Waxahachie, TX Owner Build - A race to beat the baby!!

  6. Back To Top    #6
    sheree202's Avatar
    Join Date
    Jan 2016
    Location
    Lawrenceville, GA
    Posts
    245

    Re: Hitting Rock (Excavation)

    Okay, thanks for all of the information!! I emailed the excavator and asked him specifically how does he charge if he does hit rock. Hoping to get lucky and have all of the rock in my neighbors yard too haha!
    18 x 38 gunite, 39-7 deep, 8 x 12 tanning ledge with 8 deep water, umbrella sleeve, 2 LED bubblers.
    2 Pentair LED lights, 16 long fiberglass hill slide and jump rock. Sand dune pavers/coping. TF-100. My build: Georgia Pool Build.... No Longer O/B :))

  7. Back To Top    #7

    Join Date
    Sep 2015
    Location
    Austin, TX
    Posts
    144

    Re: Hitting Rock (Excavation)

    Good idea. I think different places handle it differently. Jamie's charged by the hour but mine was fixed cost. In Austin, all excavators just assume rock and always come with a jackhammer attachment for the backhoe. They all also charge fixed prices (though you can do it differently with a rock clause - don't think I would want to bet against them as their pricing takes into account their guess). There's a video of them using it somewhere in my build thread. They were jackhammerring for a solid day, but the dig still only took 3 days even with the cost of going 150 feet each way to and from the street (extra cost).
    Construction underway.

    33x23 freeform 16k gallon IG pool, pebblesheen, SWG in Austin, TX
    Pentair 3HP VS pump, Hayward 30" sand filter
    Build thread: New Austin, TX Owner Build

  8. Back To Top    #8
    skylar18's Avatar
    Join Date
    Apr 2013
    Location
    Austin, Texas
    Posts
    299

    Re: Hitting Rock (Excavation)

    I had a fixed bid in Austin as well. I got lucky, they estimated dig would take 2-3 days. Took 2 1/2 weeks. They were quite upset they underestimated the dig by so much. The only thing that saved my PB was the excavators were in house so it kinda was a fixed cost already. I definitely didn't need gunite I had so much rock!
    43 x 19 Gunite Pool w/ spa and fire pit, 19,000 gallons, Pebble Sheen Aqua Blue finish, Jandy 2 HP VS E-pump, Jandy 580 sq ft Cartridge Filter, Jandy LXI 400k Heater, Jandy Aquapure 1400 SWCG, 4 Jandy LED color lights, Aqualink PDA and Iaqualink, Polaris 280 with Booster Pump. Polaris 9550 Robot Cleaner. 1 HP Silencer Air Blower for Spa http://www.troublefreepool.com/threa...NAL-INSPECTION

  9. Back To Top    #9
    needsajet's Avatar
    Join Date
    Jan 2016
    Location
    Sydney, NSW, Australia
    Posts
    3,557

    Re: Hitting Rock (Excavation)

    For us, it was "$poolprice" plus AU$155 per cubic metre (~US$160 per cubic yard) including disposal. In Sydney, disposal is dear because everything gets sorted/tested for contaminants due to some dodgy practices in the past. Gone are the days of free fill!

    For budgeting, I assumed the whole thing was rock so whatever the number, we were "to the good." As it turned out, it averaged ~1/3 clay on top, and almost 2/3 rock so we had a few thousand to spare. The up-charge was AU$5100 for 33 cubic metres. The PB was willing to quote all-in, but said that's how he would adjust the price - all rock. The worst outcome here in Sydney is if the pool sits on rock for part of its footprint, because then the rest must be piered to rock.

    The good thing is that the pool is locked into bedrock, no piers were needed, and it ain't going anywhere!
    12k IG salt; glass beads in plaster; K-2006C, K-1766, CCL, and Aussie 4in1 (HTH); Pentair Eco800 1.2HP VS; Zodiac SWC 1.3 lb/day (25 g/hr); 25" filter recycled glass; OKU solar panels; 1/2 HP solar pump; Rebel (Warrior) pool cleaner; FlowViz; prior pool AG 10k | Read Before Posting to get the best possible advice | ... and this helped me a lot!: TFPC for Beginners

  10. Back To Top    #10

    Join Date
    Mar 2013
    Location
    New Hampshire
    Posts
    350

    Re: Hitting Rock (Excavation)

    Attachment 46052

    They hit rocks where we are. This is literally the top coat and the first 5 minutes of digging to produce this small pile. Apparently the people building our house just put all the rocks they found in the back yard and buried them. It cost us about $5000 extra due to the trucking them out. Some times only 2 rocks per dump truck load. It was not much fun. Good luck!
    18k: IG: Black Granite Liner: Aspen: 16x33.5: SWG: Polaris 280

    My pool build new-pool-build-in-nh-t60957.html

  11. Back To Top    #11
    sheree202's Avatar
    Join Date
    Jan 2016
    Location
    Lawrenceville, GA
    Posts
    245

    Re: Hitting Rock (Excavation)

    Quote Originally Posted by doobs41378 View Post
    Attachment 46052

    They hit rocks where we are. This is literally the top coat and the first 5 minutes of digging to produce this small pile. Apparently the people building our house just put all the rocks they found in the back yard and buried them. It cost us about $5000 extra due to the trucking them out. Some times only 2 rocks per dump truck load. It was not much fun. Good luck!
    What a nightmare!
    18 x 38 gunite, 39-7 deep, 8 x 12 tanning ledge with 8 deep water, umbrella sleeve, 2 LED bubblers.
    2 Pentair LED lights, 16 long fiberglass hill slide and jump rock. Sand dune pavers/coping. TF-100. My build: Georgia Pool Build.... No Longer O/B :))

  12. Back To Top    #12
    Nectarologist's Avatar
    Join Date
    Apr 2015
    Location
    New York
    Posts
    362

    Re: Hitting Rock (Excavation)

    Good idea to find out pricing before hand. I hope it works out well for you sheree.

    You can also have instances where a developer buries tree stumps in a development. If you're building a pool where they happened to dump it's not good either.
    Inground, vinyl liner, 16 x 32 (approx. 21k gallons), roman end w/ bench, 2 Jandy LED lights
    Pump: Jandy Flopro, 1.5 hp Heater: Raypak, 266k btu (P-R266-A-EN-C; nat gas) Filter: Jandy C340 (cartridge filter) Robot: Doheny's Dolphin Discovery

  13. Back To Top    #13

    Join Date
    May 2015
    Location
    Lake Elsinore ca.
    Posts
    48

    Re: Hitting Rock (Excavation)

    Consider using rocks in the landscape design to save on disposal. Maybe even a jumping rock....

  14. Back To Top    #14
    ellsian's Avatar
    Join Date
    Jun 2014
    Location
    Peoria, AZ
    Posts
    216

    Re: Hitting Rock (Excavation)

    Quote Originally Posted by Nectarologist View Post
    Good idea to find out pricing before hand. I hope it works out well for you sheree.

    You can also have instances where a developer buries tree stumps in a development. If you're building a pool where they happened to dump it's not good either.
    This happened to my parent's pool in the 80's. They started digging up the ground and found a dump for all of the trees that the developer had buried instead. They ended up having to remove some of the trees and change the shape of the pool to fit. I don't think legally the newer builders are allowed to bury that stuff anymore because it can cause threats to the foundations of the homes.
    Swim ready :) My Pool Build Thread. IG shotcrete 34x16 Grecian shape. 22k gallons. 3'6 - 8'6 deep. 12x5 Baja ledge w/ 2 Bubblers, 14' raised beam sheer descent waterfall in stacked rock. Custom stone diving board. Hayward sand filter, VS pump, Aquarite T-15 SWCG. A&A In floor system w/ Gamma 4 venturi heads, Blue surf Pebble sheen, Colorlogic LED. Future Travertine Sandcastle Owner.

  15. Back To Top    #15


    TFP Guide

    bmoreswim's Avatar
    Join Date
    Jul 2012
    Location
    Central MD
    Posts
    3,294

    Re: Hitting Rock (Excavation)

    + 1 on using them in the landscape. Those would never leave my property.
    18'x38' Rectangle (3'-8 1/2' deep w/ diving board) - 27K gal. w/ gray plaster
    Hayward equipment (cartridge filter, 2-speed pump, SWCG, automation) View Our Build
    Coverstar automatic pool cover | StoneMakers concrete retaining wall and decking
    Spring 2013 Build | Dolphin Active 20 robot cleaner | Support TFP!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •