I've listed some extra cost items we didn't know may not be included in pool bids and would like to know if there are any more we need to be aware of...
- repair landscape/sod/etc after pool build $?
- new landscape to make area around pool look nice $?
- sprinkler repair / reconfigure $?
- upgrade gas meter ~$400
Not knowing an estimate yet on how much the first three are and not being sure if there are other costs we are not sure how much to put into the actual pool and how much to leave to cover these extras. After we decide on design and builder we can send the design out for landscape/sprinkler estimates.
- repair landscape/sod/etc after pool build $?
- new landscape to make area around pool look nice $?
- sprinkler repair / reconfigure $?
- upgrade gas meter ~$400
Not knowing an estimate yet on how much the first three are and not being sure if there are other costs we are not sure how much to put into the actual pool and how much to leave to cover these extras. After we decide on design and builder we can send the design out for landscape/sprinkler estimates.