My pool was filled 19 days ago. Test results are as follows:
CH 130
PH 7.8
FC 4
CYA 20
TA 45
Temp 66
I know the recommended level for CH is 250 - 350, but I have also heard that with new plaster pool I can expect it to rise for ~ 30 days. I'm not sure if there would be less of a rise with pebble tech. Currently my CSI is at -0.44, which is above the danger zone.
Should I raise my CH, or wait a few weeks and reassess then?
I know my CYA is low, I'm relying on tablets to raise it while it is cool, then switching to bleach.
CH 130
PH 7.8
FC 4
CYA 20
TA 45
Temp 66
I know the recommended level for CH is 250 - 350, but I have also heard that with new plaster pool I can expect it to rise for ~ 30 days. I'm not sure if there would be less of a rise with pebble tech. Currently my CSI is at -0.44, which is above the danger zone.
Should I raise my CH, or wait a few weeks and reassess then?
I know my CYA is low, I'm relying on tablets to raise it while it is cool, then switching to bleach.