    Gunite Job Partially Complete??

    My gunite job was completed on Tuesday. My pool is being built next to a South Florida lake so builder is dealing with water table. The sides of the pool and most of the bottom have gunite applied;however they did not gunite the deep end around the drain and there is still rebar showing. I called the forman and he said not to worry that it's normal where there is a higher water table, it's necessary. He said they will eventually fill that area in with an even stronger material.. Is this really normal? I am really concerned..
    Attached Images Attached Images
    25,000 gallon free form in ground gunite pool

  2. Back To Top    #2

    In the Industry
    duraleigh's Avatar
    Join Date
    Apr 2007
    Sebring, Florida

    Re: Gunite Job Partially Complete??

    Welcome to the forum.

    I would trust your PB until you have VERY good reason not to. It sounds like he is using a local technique and knows what he is doing.

    This forum is primarily pool owners.....not builders and not people familiar with local building techniques in South Florida.
    Dave S. - Forum owner
    42k vinyl and concrete pool, 1.5hp pump, 140gpm filter
    TFTestkits , PoolMath , Pool School

  3. Back To Top    #3
    Mod Squad kimkats's Avatar
    Join Date
    Jul 2012
    Tallahassee, FL

    Re: Gunite Job Partially Complete??

    I am in to watch this to learn.

    I would love for you to ask the PB what he is going to use that is "stronger" to fill in the open area. This could be a learning experience for all of us.

    OH and ask him the timing ------when will the hole be filled AND how far behind will the plaster be?

    THANKS for letting us learn with you.

    TFP Moderator 33x52 round AG 25,600 gals Sand Filter 1.5hp Pump - 2 Speed, SLAM, Pool School, Recommended Levels, Recommended Chemicals, Pool Math, Chlorine/CYA Chart, TF-100 Test Kit, Become a TFP supporter!

  4. Back To Top    #4

    TFP Guide
    Jimrahbe's Avatar
    Join Date
    Jul 2014
    Bedford, TX

    Re: Gunite Job Partially Complete??


    At this point I'm not sure you have any other option than to follow Duraleigh's advice. I suggest that you allow your PB to finish the project and see where you stand. In the meantime, document everything and take a ton of pictures.

    I do not have a clue how they deal with these issues in Florida, but I do know what happened during my pool build in Texas (DFW) area. As they were building the pool, groundwater kept collecting in the bottom of the hole. PB says "No Problem". Even after the Gunite was blown in, water came up through the holes that they purposefully left in the bottom of the pool, as well as through every plumbing penetration in the Gunite. PB says "No Problem".

    At this point I'm told that the Gunite is just for the structure and that the Plaster is what makes the pool water tight. This may be true, but the catch is that the plasterers will not apply plaster if water is actively seeping, or in my case running, into the pool. The PB waits a couple of weeks hoping the problem will go away, but it doesn't. If anything it gets worse. He made several attempts to stop the water, but none of them worked.

    To cut to the chase... the PB finally had to jackhammer up 250 square feet of new deck, and install a four foot deep, 50 foot long, 18" wide French drain on two sides of my pool, with a sump pump to continually remove the excessive water. Then of course, reinstall the deck.

    Not trying to scare you, in fact, just the opposite. The PB did not run off and leave me with a half completed hole in the ground, but rather went out of his way to work through the problems and completed the job. I suspect your PB will do the same thing for you.

    Again what other options do you have?

    Jim R.
    Finished in 2015 - 17K Gal, IG, 20' x 25' Almost Rectangular Pool, Pebble finish, three rockport water falls. Pentair Equipment: EasyTouch 4, IC40 SWG, 3 HP VS Pump, CCP5200 Cartridge Filter.
    TF100 with SpeedStir and SampleSizer, ColorQ Pro 7, Dolphin Premier Robot Cleaner, added Screen Logic 2.

  5. Back To Top    #5
    banditig's Avatar
    Join Date
    Sep 2015

    Re: Gunite Job Partially Complete??

    I watched a show a few years ago about a south Florida IG pool build (Animal Plantet reality show).
    15x54 swim & play vinyl metal wall AG
    Hayward S210T sand filter 1.5 HP Pentair Superflo vs
    Rheem raypak 130,000 BTU mv ng
    TF-100 test kit, HM digital com100 Wanda the Whale

  6. Back To Top    #6

    Join Date
    Apr 2013
    Sacramento, CA

    Re: Gunite Job Partially Complete??

    I'm actually going to be a bit stronger than Dave above. What your gunite foreman described makes sense. By having a large hole in the bottom you allow the shell to cure and fill in the hole just before plaster.

    To me this looks like a work around in a high water table environment.

    Even in dry California the gunite crew left 4 small holes in my pool shell just in case.
    22k gallon IG pebblefina, Jandy 1.5 HP VS, Jandy CV Cartridge filter, Heliocol solar panels, Polaris 360 supply side cleaner, waterfall

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts