Thread: Quick question about construction - PB ran out of gravel

  1. Back To Top    #1

    Join Date
    Aug 2011
    Weston, FL (Miami/Ft Lauderdale suburbs)

    Quick question about construction - PB ran out of gravel

    Hi everyone

    Our PB started our dig on thursday, pouring gravel all over the bottom of the hole.

    They ran out of gravel 3/4 of the way in. I called the office to ask about when they would deliver extra and was told that the gravel is only used to help manage the water/mud during the dig and that is not really necessary to cover the whole hole bottom.

    Does this ring a bell? Will not having gravel under the whole gunite shell will be a problem?


    Sent from my iPhone using Tapatalk
    In construction (well, it is really permitted and we are waiting on PB to start digging, long story): 86 LF free form gunite, sundeck bubbler, jets on swimout. Hayward automation, pump (2-speed) and 40K gallon SWS
    In design: 20' ODK not idea what is going to look like yet

  2. Back To Top    #2
    Mod Squad
    Join Date
    Aug 2012
    DFW, TX

    Re: Quick question about construction - PB ran out of gravel

    I have no gravel under mine.
    TFP Moderator
    If TFP helped you or saved you money - Become a TFP Supporter! <--Click here
    2012 build and pics, 20k gal gunite, black onyx pebblesheen, OK flagstone, IntellifoVS, cart filter w/Pleatco, IC40 SWG, Solartouch, 5 12'x4' solar panels, HP50HA heat pump, 8mil solar cover, borates, TF-100 test kit, SONOS, Doheny's Discovery Robot, hot tub on bleach

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts