So our timing is going to tight. Looking at factors to determine if we need to make special arrangements.
We have no clue what is involved(or how long) in getting the pool chemistry correct after our start up.
We have a vacation planned about 10 days after we do our acid start up. The plan is Monday apply quartz. We think it will take two days to fill. Then the PB applies the acid start up. We plan on brushing 4 times a day. So, one week later we are at Wednesday or Thursday. The PB adds the neutralizer. That gives us 2 days to balance the water. We go to the beach on Saturday. We think we can get some one responsible to brush twice a day for the 6 days we are away.
Our thoughts:
1) How difficult will it be to get the chemistry correct after the acid is neutralized? Will it require more monitoring over the days we are going to be away?
If this is a critical period (we have brushing covered) for chemistry we may just have one of us go to beach with kids and the other stays and monitors. We don't want to postpone the finish. August has a hectic work schedule.
We have no clue what is involved(or how long) in getting the pool chemistry correct after our start up.
We have a vacation planned about 10 days after we do our acid start up. The plan is Monday apply quartz. We think it will take two days to fill. Then the PB applies the acid start up. We plan on brushing 4 times a day. So, one week later we are at Wednesday or Thursday. The PB adds the neutralizer. That gives us 2 days to balance the water. We go to the beach on Saturday. We think we can get some one responsible to brush twice a day for the 6 days we are away.
Our thoughts:
1) How difficult will it be to get the chemistry correct after the acid is neutralized? Will it require more monitoring over the days we are going to be away?
If this is a critical period (we have brushing covered) for chemistry we may just have one of us go to beach with kids and the other stays and monitors. We don't want to postpone the finish. August has a hectic work schedule.