Finally got all of my plumbing ran, the steel steps bolted in, the lights (2), the skimmers (2) , the returns (5), the main drain, the overflow, a backwash line and the footer drain in place. Tomorrow hoping to have to footer poured. After that only 1 small piece of downspout drain line to...