So I am essentially doing the contracting of burying a Radiant Metric GT pool. I was worried about digging too deep, so I kept the depth a little high. Because of the grade of the lot, the pool is 7" above grade in the front and 20" above grade in the back. I haven't backfilled yet, but I am...