First ever SLAM. We have auto cover and typically cover every evening. Do I cover or leave open overnight with FC at SLAM levels?
FC- .5
CC-1.5
PH 7.2
TA-180
CH-225
CYA 30
Water looks beautiful, but with CC above .5, I figured a SLAM was needed
Do I just ask PB to put enough stabilizer (CYA) to get me to 30PPM? Or do I have them go through complete setup and let them add pucks? I am planning on using bleach/MA, but don't know how this handoff is going to play out. Any advice would be helpful. Thanks in advance
Excavator dropped off today and rain in the forecast for the next several days. Thanks to this forum, I have my test kit already and armed to have a TFP. Hoping a dig starts soon. Details of build in signature and many pictures and questions to follow. Thanks in advance