Search results

  1. B

    First Test Readings!

    Ph 7.5 CHl 6.0 CC .5 Alk 150 CH 260 CY 30 Water is within 2" of full line from first filling. It has taken close to 5 days to fill. I have added a total of 3 quarts of E-Z Chlor Metal Magnet. We do have metals in our water. I added more dissolved Cyanuric (Stabilizer) to water, since...
  2. B

    Next step while filling up pool

    Water hose has been running from well through a Sta-Rite Posi Flo Filter out to the pool through a sock with fiber fill for the last 2 days. We are only about 1/3 full. I have added two quarts of E-Z Chlor Metal Magnet. Water is clear but I think I see a tint of metal. I have already started...
  3. B

    Something under liner!!!

    The liner has been installed and as we're filling I noticed one of the decorative rail cap covers must have fell under the liner! The object is about 8" frim the side & the water is about 8-12" high. I have stopped the water filling. Should we try to remove 3-4 of the top rails, the stabilizer...
  4. B

    New Pool Setup-Ready to hard plumb- What size PVC?

    We are ready to hard plumb our A/G pool. What size PVC should we use considering the second skimmer & return are 60+ feet from the pump/filter? We thought that 2" would be good then reduce to 1-1/2" 6" from equipment. Any advice would be appreciated.