|
It is currently May 25th, 2012, 1:14 pm
|
 |
|
 |
|
| Author |
Message |
|
MattM
|
Post subject: Process to online a new automated pool?  Posted: September 18th, 2011, 9:31 pm |
| Platinum Supporter |
 |
 |
Joined: July 13th, 2011, 11:03 pm Posts: 233 Location: San Diego, CA
|
|
We're in the process of pool building, and expect to bring it online roughly on Nov 1st.
My builder has told me we'll need to keep the salt system offline for the first few weeks. I've also heard that we may need to keep the heater(s) off initially. The pool also has an auto muriatic acid ph reduction system (intellichem). Heating is a combination of solar and heat pump.
From what I can tell, the startup process will mostly involve:
First day or two: fill up water, turn on pump, add DE to pool for filter, check for any leaks Next few days: take water tests, and focus mostly on getting ph to 7.5-7.8 ideal level Then: Focus on TA, Calcium, and other key parameters..don't let ph stray too far while doing so Afterwards: Add salt and probably borates, more testing for a few days During the above, the pump should be running quite a bit but none of the other automation When chemistry seems stable, activate the intellichlor first and a day or two later the intellichem Wait another few days and then activate the heating systems, put all system onto their long term in-season automated schedule Monitor water temp, pressure, and all other general tests/etc on a daily basis for at least the first 30 days
The plaster surface is pebble sheen blue granite.
I'm not sure how long this all process is supposed to take, and roughly how many days after start that we should expect the pool to be safe to swim...
Also, we have an automatic safety cover, which I assume we'll avoid using until ph is in balance since we don't want it to come into contact with any water that might be too acidic/etc ...so perhaps that goes into use after the first 10-14 days.
Anything I'm missing? Any additional pump/filter maintenance in the first few weeks, should I plan to do a complete cleaning of the filter after the first 30 days?
_________________ 24K gallon inground gunite/pebble sheen pool, 34'x16' 4-7.5ft deep, 750sq ft solar, pentair ultratemp, intelliflow vs+, ic60, intellichem w/ acid pump, quad de 100, intellibright 5g, intellitouch i5-3s with Screenlogic2, 3" primary piping - 2.5" at equip pad, auto switched deep heating and main returns, automatic safety cover w/ electronic lock and embedded recessed undertrack, sealed stamped concrete deck, dolphin deluxe 5, started up December 2011.
|
|
|
|
 |
|
MattM
|
Post subject: Re: Process to online a new automated pool?  Posted: September 19th, 2011, 1:32 pm |
| Platinum Supporter |
 |
 |
Joined: July 13th, 2011, 11:03 pm Posts: 233 Location: San Diego, CA
|
|
Bama -- I don't understand the reference to 30 days before adding salt? I understanding waiting for pool chemistry to stabilize which might take at least two weeks, plus avoiding activating or changing too many things in the same week, but what is the reasoning for waiting 4+ weeks before adding salt to pool...and I assume a few days after that before turning on salt system?
_________________ 24K gallon inground gunite/pebble sheen pool, 34'x16' 4-7.5ft deep, 750sq ft solar, pentair ultratemp, intelliflow vs+, ic60, intellichem w/ acid pump, quad de 100, intellibright 5g, intellitouch i5-3s with Screenlogic2, 3" primary piping - 2.5" at equip pad, auto switched deep heating and main returns, automatic safety cover w/ electronic lock and embedded recessed undertrack, sealed stamped concrete deck, dolphin deluxe 5, started up December 2011.
|
|
|
|
 |
|
JasonLion
|
Post subject: Re: Process to online a new automated pool?  Posted: September 19th, 2011, 5:07 pm |
| Site Admin |
 |
 |
Joined: May 7th, 2007, 3:03 pm Posts: 23804 Location: Silver Spring, MD
|
|
You don't normally want to adjust the TA or CH levels for three weeks after the application of plaster. Both will be going up from the curing process. Raising either too early will result in them being too high by the end of the first month.
The National Plasterers Council recommends not to add salt for the first 30 days. Supposedly it runs some risk of damaging the plaster while it is curing. You can turn on the SWG 24 hours after adding salt.
During the first three or four weeks you will probably be lowering the PH daily. Curing plaster raises PH very quickly.
_________________ 19K gal, vinyl, 1/2 HP WhisperFlo pump, 200 sqft cartridge filter, AutoPilot Digital SWG, Dolphin Dynamic cleaning robot TFP Admin. Creator of The Pool Calculator. Other handy links: Support this site, TF Test Kits, Pool School
|
|
|
|
 |
|
Bama Rambler
|
Post subject: Re: Process to online a new automated pool?  Posted: September 20th, 2011, 6:41 am |
| Mod Squad |
 |
 |
Joined: June 22nd, 2009, 7:06 pm Posts: 11351 Location: South Alabama
|
What Jason said.  Wouldn't you rather manually dose the first 30 days than to take even a remote chance of damaging that sparkling new pebble surface the first month into having it? That's how I look at it.
_________________ Dave J. TFP Moderator 24' x 52" Round AGP. 1.5hp Dynamo pump. 24" Pentair Sand Dollar Filter. 45MHP2(3GPD) Peristaltic Pump Pool School Pool Calculator TF-Test Kit You have passed the OCLT when: 1)You lose 1ppm or less FC overnight, & 2)You have .5ppm CC's or less, & 3)your water is clear.
|
|
|
|
 |
|
|
 |
|
 |
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot post attachments in this forum
|
|