How to connect pool heater natural gas line to stub up

ForceEdge

Well-known member
Aug 7, 2020
130
Long Island
Pool Size
27000
Surface
Vinyl
Chlorine
Salt Water Generator
SWG Type
CircuPool RJ-60 Plus
So i don't know if I'm just not understanding this but how would i connect threaded pipe to this if everything has to be tightened. once i reach the heater how would i connect? do i need to use reverse threads or am i just not thinking about this correctly

it is a raypak avia
 

Attachments

  • IMG_5821.jpeg
    IMG_5821.jpeg
    303.4 KB · Views: 12
  • IMG_5823.jpeg
    IMG_5823.jpeg
    304 KB · Views: 12

Check with your local building department to see if they require a permit and/or inspection.
Nautural gas leaks are no joke.
 
  • Like
Reactions: ForceEdge

Check with your local building department to see if they require a permit and/or inspection.
Nautural gas leaks are no joke.
THANKs so much!

Yes, everything was already permitted, the 2 inch line run to the stub up already has an inspection/gas pressure test done. The connection to the pool heater just needs to be made and they come in for a final inspection to see if it was all connected correctly and fully pass it.

so i was going to connect the heater myself