Hazy water

For a successful SLAM Process
you need to continue to MAINTAIN Slam level fc for your cya FC/CYA Levels
as often as possible (multiple times per day is best) until you meet ALL 3 end of slam criteria-

You are done when:

✅ CC is 0.5 or lower;
✅ You pass an Overnight Chlorine Loss Test
AND
✅ The water is clear.
(Crystal Clear w/no algae dead or alive)

Do all things 👇
*Check & scrub every nook & cranny where algae may hide (light niches, steps, drain covers, ladder handrails, skimmer throats/weirs, abandoned lines, autofill, overflow drains, etc.)
*If water can go there, algae can thrive there.
*Run slam level water through all water features & lines for at least a couple hours a day during the SLAM Process.
*Brush & or vac daily (this breaks up biofilms that algae uses to protect itself from chlorine)
*Backwash/clean filter when pressure rises 25%over clean pressure.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.