It is currently May 25th, 2012, 6:35 am

All times are UTC - 6 hours [ DST ]



 Page 1 of 1 [ 3 posts ] 
Author Message
 Post subject: Opening a Pool to High Chlorine Demand -- Ammonia
PostPosted: June 9th, 2008, 8:29 pm 
Special Contributor
Special Contributor

Joined: March 28th, 2007, 2:40 pm
Posts: 5410
Location: San Rafael, CA USA
This post is in response to this post from piku.

Either chlorine or MPS can be used to get rid of ammonia. I disagree that using chlorine to do so creates problems that are harder to get rid of. I've heard that before and yet the breakpoint chlorination models don't support that except with extreme excessive chlorination. I've walked through several pool owners opening their pool to lower CYA and high ammonia and have had them get rid of it using chlorine with no leftover Combined Chlorine (CC), but they had 3-6 ppm ammonia, not 15 ppm that you had.

Basically, 4.2 pounds of non-chlorine shock in 10,000 gallons is equivalent to 10 ppm FC of chlorine (1.6 gallons or 2.1 96-ounce jugs of 6% bleach). Given that non-chlorine shock costs $30 for 12 pounds for the least expensive one I could find (more typical is $95 for 20 pounds), that's $2.50 per pound or a little over $10 to be equivalent to 2 jugs of 6% bleach that are usually around $2.50 or so for the pair. It is more economical to use chlorinating liquid or bleach instead of MPS.

When closing a pool over the winter and letting it go by not adding chlorine to it regularly or having sufficient algaecide, then soil bacteria that gets into the pool can grow and convert Cyanuric Acid (CYA) into ammonia via the degradation pathway shown in this link. The net equation is as follows:

C3H3N3O3 + 4H2O --> H+ + HCO3- + 3NH3 + 2CO2
Cyanuric Acid + Water --> Hydrogen Ion + Bicarbonate Ion + Ammonia + Carbon Dioxide

So the net result is a lowering of pH with some release of carbon dioxide and increase of carbonates in the water (the TA remains unchanged for technical reasons I won't get into here). For every 10 ppm CYA that is decomposed, it produces around 3.3 ppm ammonia (measured as ppm Nitrogen) and would require around 30 or so ppm FC to get rid of it. Fortunately, ammonia is a little volatile so some of it may outgas.

When you first add the chlorine, it converts the ammonia to monochloramine which registers as Combined Chlorine (CC) and this happens in seconds with no CYA or about 1 minute with 30 ppm CYA.

HOCl + NH3 --> NH2Cl + H2O
Hypochlorous Acid + Ammonia --> Monochloramine + Water

Then, additional chlorine oxidizes the monochloramine to the products shown below and with no CYA in the water that takes around 10 minutes for 90% completion. With 30 ppm CYA, it can take several hours. So generally speaking it is best to not add more CYA until one gets rid of the ammonia. There will be more nitrogen trichloride produced, but that is easily removed through outgassing and breakdown from sunlight (I do not show the more complex reactions below).

HOCl + 2NH2Cl --> N2(g) + 3H+ + 3Cl-+ H2O
Hypochlorous Acid + Monochloramine --> Nitrogen Gas + Hydrogen Ion + Chloride Ion + Water

Note that the above reaction is acidic, but it exactly compensates for the alkalinity (high pH) of hypochlorite sources of chlorine. It takes three hypochlorous acid to oxidize two ammonia. On a ppm basis, this is a chlorine to ammonia ratio of 7.6, but greater efficiency to completion is achieved using a ratio of 8-10 so that is where the 10x rule comes from and it only applies to ammonia measured as ppm Nitrogen, NOT to monochloramine which is measured as ppm Cl2. You can see that it takes one hypochlorous acid to oxidize two monochloramine so that's a little more (for efficiency) then an FC level of half the CC level.

The net reaction of oxidizing ammonia using a hypochlorite source of chlorine may be written as:

3OCl- + 2NH3 --> N2(g) + 3Cl-+ 3H2O
Hypochlorite Ion + Ammonia --> Nitrogen Gas + Chloride Ion + Water

Richard


Last edited by chem geek on November 16th, 2008, 4:15 am, edited 2 times in total.

Offline
 Profile  
 
 Post subject:
PostPosted: June 10th, 2008, 1:05 pm 
Lifetime Supporter
Lifetime Supporter

Joined: March 12th, 2008, 2:29 pm
Posts: 259
Location: Hatfield, PA
But - the fact that MPS is not bound to CYA means you need to shock with less which thereby improves the economics if your CYA is very high.. According to your figures it doesn't fix it, but it makes it better.



_________________
Infusix, LLC Home and Pool Automation
Offline
 Profile  
 
 Post subject:
PostPosted: June 10th, 2008, 1:42 pm 
Special Contributor
Special Contributor

Joined: March 28th, 2007, 2:40 pm
Posts: 5410
Location: San Rafael, CA USA
That's not completely true because chlorine bound to CYA simply changes the reaction rate, but not how much is needed to complete the reaction. Remember that the chlorine bound to CYA is released as hypochlorous acid gets used up. So the MPS might oxidize the ammonia faster, but the few hours that it takes for chlorine to do the job in the presence of CYA is no big deal. I agree with you that in the worst case of 100 ppm CYA, and using 10 ppm FC to oxidize 1 ppm ammonia, it takes 14 hours to get to 90% completion. Of course, with that much CYA in the water, a partial drain/refill is in order anyway and that should be done first.

Richard


Offline
 Profile  
 
Display posts from previous:  Sort by  
 Page 1 of 1 [ 3 posts ] 

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  


TroubleFreePool.com The Web