|
It is currently May 25th, 2012, 3:59 am
|
 |
|
 |
|
| Author |
Message |
|
johnw100
|
Post subject: New concrete pool leaving half full.  Posted: January 9th, 2012, 9:36 am |
Joined: January 9th, 2012, 9:28 am Posts: 5
|
|
Hi All
We`ve just had a new concrete pool installed on a piece of land we purchased. The problem is because we are still waiting for the electricity supply to be connected we are unable to install the lights in the pool. So the pool constructors have said to half fill the pool to just below the lights to prevent any cracks until the electricity is installed. Does anyone know how long is safe to leave it like this, we`re hopeful it will be all up and running in a week or two. We`re just concerned of anything happening in the meantime. The constructors are saying they are not taking any responsibilty to what happends whilst its not fully filled with water.
Thanks
J
|
|
|
|
 |
|
duraleigh
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 10:05 am |
| Special Contributor |
 |
Joined: April 1st, 2007, 8:12 am Posts: 11327 Location: Raleigh, NC
|
Welcome to the forum. Quote: So the pool constructors have said to half fill the pool to just below the lights to prevent any cracks until the electricity is installed. I might be missing something but not having power to the lights is not relevant as to whether or not the pool can be filled.
_________________ Dave S. Site Owner TFTestkits owner TFTestkits , Pool Calculator , Pool School
|
|
|
|
 |
|
daddybug
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 10:17 am |
Joined: March 29th, 2011, 1:35 am Posts: 47 Location: Hazelton, PA
|
|
What type of pool surface? Plaster, Peeble???
|
|
|
|
 |
|
johnw100
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 10:32 am |
Joined: January 9th, 2012, 9:28 am Posts: 5
|
|
Hi
Sorry, the lights are yet to be wired in so there are just 4 holes in the sides of the pools ready for lights. Hence why we cant fill it any more. The electrician is coming today to wire them all in but until the electricity company switches on the power he wont be able to test them. So the pool will need to be left half full until they are tested.
The pool is concrete/gunite and is rectangular 20ft by 12ft and goes down to a depth of 6ft
Thanks
|
|
|
|
 |
|
duraleigh
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 11:32 am |
| Special Contributor |
 |
Joined: April 1st, 2007, 8:12 am Posts: 11327 Location: Raleigh, NC
|
Quote: So the pool will need to be left half full until they are tested Not trying to be thick-headed, but he can certainly test continuity with a handheld device. There's not much else to test.
_________________ Dave S. Site Owner TFTestkits owner TFTestkits , Pool Calculator , Pool School
|
|
|
|
 |
|
johnw100
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 11:42 am |
Joined: January 9th, 2012, 9:28 am Posts: 5
|
|
Yeah you`re right, i`ll suggest he checks the lights work fine first and then wire in all the connections instead of waiting for the mains to be switched on. Didnt think of that, I was told he needed the electricity first.
Thanks
|
|
|
|
 |
|
bk406
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 11:43 am |
Joined: December 3rd, 2009, 11:28 am Posts: 2419 Location: Central Massachusetts
|
duraleigh wrote: Not trying to be thick-headed, .
Maybe i am too You can fill a pool up with water and put the light in the niche later. I'ts not as easy for the installer, but it;s done a lot. Mine was done after the pool was filled simply because they forgot to bring the fixture. The power is run to a J-box somewhere behind the pool deck. The power cord on the light is fiched thu the conduit up to the J-box. Unles thi is wired completely different that any i've ever seen.
_________________ 14,000 gallon IG, Vinyl. Hayward 3/4 hp superpump, Penatair IC40 SWCG, Pentair automation, Hayward sand filter, Aqua Comfort heat pump, Hayward 400k Lo-Nox LP heater.
|
|
|
|
 |
|
daddybug
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 11:54 am |
Joined: March 29th, 2011, 1:35 am Posts: 47 Location: Hazelton, PA
|
|
Plaster or pebble??? If you fill it half way with white plaster, you will have a water line stain that will be difficult to remove later. If its pebble, then its not a problem!
|
|
|
|
 |
|
Lana537
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 9th, 2012, 2:00 pm |
| Lifetime Supporter |
 |
 |
Joined: May 16th, 2009, 2:59 pm Posts: 230 Location: The Triangle, NC
|
|
This is indeed an unusual situation. No electricity? So no lighting or anything at all on the property? Or is it only the pool and its equipment/filter/pump that doesn't have electricity?
Lana
_________________ 25,000 gallon, refurbished 1960's inground concrete, Jandy sand filter w Jandy 1.5hp single-speed pump, Pool Pilot Digital SWCG+Chemtrol 2100+CO2 tank; PebbleTec White Pearl with 10% Cobalt Blue Dark Beadcrete by Olympic Pool Plastering, Georgia. Taylor K-2006 Test Kit; Aqua Check Salt test; LaMotte borates test, and Jack's Magic Sequest test kit; SparklyPoolitis level: extremely high.
|
|
|
|
 |
|
XsAllOverIt
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 10th, 2012, 8:30 am |
| Lifetime Supporter |
 |
 |
Joined: December 8th, 2010, 2:39 pm Posts: 502 Location: Mount Airy, Maryland
|
|
I'm assuming they didn't run any electric yet? No problem leaving the pool 1/2 full with respect to hydrostatic pressure, but I'm not sure why you wouldn't have had the light installed prior to adding plaster, if that's the case. Only filling 1/2 full with plaster already in place may cause staining and excessive drying of the plaster. I know that when we had our pool filled, it was important to add the water all the way when the plaster was applied and keep water running until full to avoid staining. If the plaster isn't applied yet and it's the concrete shell, you're fine, but that wouldn't make sense to fill the pool before the plaster is applied. Not sure if we have all the details correct from your post? I think PB's sometimes do things in the wrong order just to get their installment payments.
_________________ 18 x 36 Inground Gunnite, White Plaster 21K gallon 18" raised spa, 8' Diameter (620 gallon) Triton II Sand filter, Intellichlor IC40 SWG Pentair Pump, Max-E-Therm 400 BTU Lamotte ColorQ PRO 7-Plus test kit TFT-100 test kit
|
|
|
|
 |
|
johnw100
|
Post subject: Re: New concrete pool leaving half full.  Posted: January 10th, 2012, 5:26 pm |
Joined: January 9th, 2012, 9:28 am Posts: 5
|
|
Thanks for the responses.
The pool has been painted so its not bare plaster. Also have been slowly filling the pool upto the light positions. The electrician is coming tomorrow now the electricity has been switched on. It was an empty plot we are building the pool on so no electricity or water up until now which made things awkward (long story). But it looks like its getting sorted now.
|
|
|
|
 |
|
|
 |
|
 |
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot post attachments in this forum
|
|