I am not sure even where to go from here. There is not much left on the build to finish. Once the guys finish the decking on Monday, then they will clean up and do the bed prep around the pool and put down gravel along the fence, then they will do plaster. The lady is actual owner of the architecture design firm that I hired to do the master plan....so it is not likely to she is going to disappear from this project. It is really bad business for her to be so mad about stupid stuff and behave so horribly....It is not like I did not spent a lot of money on the pool build, and she is not making money on this pool build. Through out the build, she charges me every single change orders, and upgrade. They even wanted to charge me extra for the abalone shell that came with the Tropics Blue mini pebble Stonescape. I asked them if the abalone shells did not come with the plaster, then why the sample of Tropics Blue has shells in there. PB said maybe it is the best one to show case the shells and it will cost us $350 to add the shells just to make the plaster looks like the sample......So, I called NPT myself and asked if the original Tropics Blue minipebble stonescape came with abalone shells. The customer representative said "yes". It is the only Stonescape plaster that has abalone shells in. She does not even know why PB wanted to charge extra for having the shells in the mix because it came with the shells. So I told the PB that I am not paying a single penny more to add the abalone shells because the original formula for the plaster does call for abalone shells, and they better make sure that my Minipebble Stonescape Tropics Blue plaster looks like the sample board. I guess they (GC, PB, and construction manager) were not happy about that run in already.
Then, right before all these upset happened with the sub, I also made a stand on the installation of IntelliPH unit and asked them to do it for me as a courtesy or at cost, because I believed that we deserve some kind of compensation for the build to be taking so long and multiple mistakes happened during the build and delay the progress. If you see my earlier posting, you would see PB wanted to charge me $1750 for the unit and installation (this unit was not in the contract, and I like to add after doing some research about the unit). It is an outrageous number especially the unit itself is only $500 and the labor for installing the unit the most $300 (I called around because I thought the number was too high). The PB said that they would not want other people to install the unit because that would void the plumbing warranty from the plumbing sub, so that does not give me the option of getting other people to install the unit. So, I told PB that then it is important for them to consider my request of giving me this unit and installation as a courtesy or at cost , and that was two weeks ago. Anyhow, after all the stuff happened with the sub doing work for me on the side, I got a series of angry texts yesterday from the GC lady saying that what ever the PB decide to charge me with regarding IntelliPH is the final decision and she is not going to change her mind on that. So, I will find out what they decide on this issue on Monday.
I really hate that there is really not much of protection for the home owners in the pool building business. When we signed the contract, of course, they would not specify how long the build will take. However, I was told 10 to 12 weeks.....now 8 month later we still do not have a pool. how is that fair to me and my family? I have not once lose my cool with them, even through the time period that they totally messed up on the concrete copings, took them three weeks to decide that they should remove them at their cost. However, we then had to pay a premium fee to upgrade to leuder stone copings ($35 a linear feet) if we did not want them to do it again in concrete. So we sucked it up and paid for the upgrade and be done with it, and we do love the stone copings. Then I was worried that the concrete crew will mess up the decking around the pool like they messed up on the copings, we decided to get the leuder stone pavers instead of stamped concrete. Of course, they charged me premium for that at $26 per sf. So, for the GC lady to lose her cool on such a small issue of me using her sub to do a couple of small jobs really upsets me because she made a lot of money off me already why she is mad about a couple of thousands that I did not let her in on......
All I have to say right now is if they have any sense of humanity, I hope that they will get that IntelliPh unit installed for me at cost without mark up ( I do not think they will do it as a courtesy...). Otherwise, I will "lite up" on them....or I will go on Houzz and any review sites to simply state "if you want a project that goes on forever, or a swimming pool build that takes more than 8 months (going on 9), then please choose this company."