brg88tx
|
Post subject: first day of construction....WOW  Posted: June 14th, 2011, 7:51 pm |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
they dug the hole, rebarred it, and rough plumbing all today.
question, i was under the impression that our pb was using all 2" pipes, but the rough plumbing pipes for the skimmers and jets are all 1 1/2". is this standard?
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 14th, 2011, 8:08 pm |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
correction, my skimmers have 2" rough plumbing, but all the return jets and bubblers are 1 1/2". is this ok?
|
|
|
|
 |
|
JasonLion
|
Post subject: Re: first day of construction....WOW  Posted: June 14th, 2011, 8:11 pm |
| Site Admin |
 |
 |
Joined: May 7th, 2007, 3:03 pm Posts: 23753 Location: Silver Spring, MD
|
|
That should be fine, particularly if there are several pipes running in each direction. Many builders simply go all 2" these days, but it doesn't make nearly as much difference on the returns as it does on the suction lines, and running several pipes in each direction is equivalent to running a single larger pipe.
_________________ 19K gal, vinyl, 1/2 HP WhisperFlo pump, 200 sqft cartridge filter, AutoPilot Digital SWG, Dolphin Dynamic cleaning robot TFP Admin. Creator of The Pool Calculator. Other handy links: Support this site, TF Test Kits, Pool School
|
|
|
|
 |
|
Hilltop Pools
|
Post subject: Re: first day of construction....WOW  Posted: June 14th, 2011, 8:45 pm |
Joined: June 14th, 2011, 8:34 pm Posts: 4
|
|
Good evening! We find that the best way to plumb a pool is to have volume going to the pump (2") and velocity returning to the pool (1.5"). This lowers the RPMs on the pump and provides great water movement in the pool. I hope you have a great build! Matt Miller, CBP Hilltop Pools- Atlanta, Ga
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 14th, 2011, 9:11 pm |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
thanks for the replies. there are a lot of return jets. my double deep end drain and the 2 skimmers appear to be the only 2" pipes. i assume all the 1 1/2" return pipes will tie into a larger 2" pipe when the plumbing is complete?
|
|
|
|
 |
|
JasonLion
|
Post subject: Re: first day of construction....WOW  Posted: June 15th, 2011, 10:35 am |
| Site Admin |
 |
 |
Joined: May 7th, 2007, 3:03 pm Posts: 23753 Location: Silver Spring, MD
|
|
Ideally you want each skimmer, drain, and return pipe running back to the equipment pad. Not all builders to that, and it can still be fine, especially with many returns, as long as there is still more than one pipe in each direction coming back to the equipment pad. The more the pipes combine into one near the pool, the more important it is to use larger pipes once they have combined.
_________________ 19K gal, vinyl, 1/2 HP WhisperFlo pump, 200 sqft cartridge filter, AutoPilot Digital SWG, Dolphin Dynamic cleaning robot TFP Admin. Creator of The Pool Calculator. Other handy links: Support this site, TF Test Kits, Pool School
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 15th, 2011, 4:22 pm |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
they're guniting as i type this. does the process usually go this fast? i'm not complaining.
|
|
|
|
 |
|
JasonLion
|
Post subject: Re: first day of construction....WOW  Posted: June 15th, 2011, 7:24 pm |
| Site Admin |
 |
 |
Joined: May 7th, 2007, 3:03 pm Posts: 23753 Location: Silver Spring, MD
|
|
When all the sub-contractors schedules line up, a pool can go together in a week or less start to finish. Of course, it is far more common for things to drag on for weeks with bursts of activity and then quiet periods.
_________________ 19K gal, vinyl, 1/2 HP WhisperFlo pump, 200 sqft cartridge filter, AutoPilot Digital SWG, Dolphin Dynamic cleaning robot TFP Admin. Creator of The Pool Calculator. Other handy links: Support this site, TF Test Kits, Pool School
|
|
|
|
 |
|
wamaha
|
Post subject: Re: first day of construction....WOW  Posted: June 15th, 2011, 10:13 pm |
| Lifetime Supporter |
 |
Joined: May 4th, 2011, 8:38 am Posts: 43
|
JasonLion wrote: When all the sub-contractors schedules line up, a pool can go together in a week or less start to finish. Of course, it is far more common for things to drag on for weeks with bursts of activity and then quiet periods. Our build is an unfortunate example of this. We had about 6 days between gunite and plumbing, and about 18 between gunite and rock work. Builder was ready to roll, but most of the builders don't do much more than supervise, so they are at the mercy of shared subs. HOPEFULLY, you won't experience that kind of a delay. Its too **** hot here in TX to be without a pool 
_________________ IG ~12,500 gallon, Hayward Cartridge Filter, Wetedge Luna Quartz plaster (Pacific/Aruba), Pool Pump: 1.0 HP Tristar by Hayward, Waterfall Pump: 1.0 HP Super II by Hayward
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 16th, 2011, 10:11 am |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
257WbyMag wrote: :nopic: 
You do not have the required permissions to view the files attached to this post.
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 16th, 2011, 4:30 pm |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
question about the gunite finish.....the guys worked up until 10 pm last night finishing. they had lights but it was still very dark. i noticed the walls and especially parts of the floor were very rough. are the plaster people responsible for smoothing this out before plaster is applied?
|
|
|
|
 |
|
dmanb2b
|
Post subject: Re: first day of construction....WOW  Posted: June 16th, 2011, 6:37 pm |
| Lifetime Supporter |
 |
 |
Joined: April 4th, 2009, 9:30 am Posts: 3294 Location: NY
|
Rough is good  Plaster has something to adhere to and make it buttery smooth 
_________________ 24'x52" AGP (13,500 Gallons), Intex SWG, (2)Solar Bear 4x20 panels, Hayward S220T Filter, 1/2hp Pentair Superflo
Pool School, TFTestKits, Pool Calculator
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 21st, 2011, 11:32 am |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
well, i guess i jinxed myself. it's been almost a week since gunite and......nothing. i've been watering the gunite 5-6 times a day trying to keep it cool in this 100+ degree heat.
i assume the delay is to let the gunite cure?
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 28th, 2011, 10:54 am |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
a little more progress....flagstone coping and waterfall. plumbing guys are out today.
You do not have the required permissions to view the files attached to this post.
|
|
|
|
 |
|
Raider4251
|
Post subject: Re: first day of construction....WOW  Posted: June 28th, 2011, 5:04 pm |
Joined: March 28th, 2011, 8:22 pm Posts: 30
|
|
Things are moving quickly for you. Mine took just over five weeks. My PB did a great job. Congrats on the pool!
_________________ Size 12,000 gal | Filtration Jandy 340 CL Cartridge | Sanitation Jandy 1400 AquaPure SWG | Placement In-ground Gunite | Finish Medium Gray Plaster | Automation Jandy Aqualink RS w/PDA6 Pump Jandy 2.5hp 2 speed Stealth | Location New Orleans LA Heat Jandy EE2000t Test kit Taylor K-2006 (fas-dpd)
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: June 29th, 2011, 10:53 am |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
got my equipment installed today
You do not have the required permissions to view the files attached to this post.
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: July 5th, 2011, 9:36 am |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
decking framed and ready to pour peagravel deck today or tomorrow.
You do not have the required permissions to view the files attached to this post.
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: July 7th, 2011, 3:40 pm |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
we're putting flagstone on the steps
You do not have the required permissions to view the files attached to this post.
|
|
|
|
 |
|
brg88tx
|
Post subject: Re: first day of construction....WOW  Posted: July 8th, 2011, 5:20 pm |
Joined: May 17th, 2011, 10:05 am Posts: 111 Location: Montgomery, TX
|
|
i think they will probably apply the standard white plaster next week. the forecast is for highs around 100-102. should i be worried about applying plaster in this extreme heat? thanks.
|
|
|
|
 |
|
|
 |
|
 |
|