Well after what seemed like the longest wait ever my PB broke ground today on our 18x36 liner pool. Kids are very excited. I am to but honestly I am still wondering if I am doing the right thing here. No looking back now though. I am sure I will have a ton of questions during this process. So thanks in advance.


Last edited by VOL61 on August 6th, 2011, 8:16 am, edited 1 time in total.

Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: April 16th, 2011, 11:00 am 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
As you can see from the pictures we have a ton of work to do. Our neighbor built storage units on the lot directly behind us so needless to say we will be adding some landscaping for privacy. We have big plans (at least for us). It rained today so the hole that was dug yesterday is already filling with water. But there wasn't any rock so at least that was good.


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: April 16th, 2011, 11:03 am 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
one more....


You do not have the required permissions to view the files attached to this post.


Last edited by VOL61 on May 13th, 2011, 10:48 am, edited 1 time in total.

Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: April 21st, 2011, 1:46 pm 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
Already running into problems..... The water you see in the top picture will not go down. We have had a ton of rain of late here in our area. But the water has actually risen to at least a couple feet deep. It has been that way since the dig. Which was over a week ago. The PB came today with a pump and got the water out but it filled back up almost as soon as it was emptied. The PB said we would need a hydrostatic valve as well as raising the level of the pool by a foot. This means I will have to have dirt brought in which will add to cost.

Is this a common problem? Will it be a future problem if there is water under the liner? Can someone explain to me how a hydrostatic valve works with a liner pool? Is it connected to a pump?


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 12th, 2011, 8:18 am 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
Well here are some more photos. PB worked with me on the price of the fill. Said he would pay half. Also found a pretty good deal @ $65 a tandem load. It is probably going to take about 40 loads though. Yikes.... I know. Lot of shale and dirt. As far the the water I am pleased with what he has done to handle that. He dug a well point down at the bottom of my property and filled it with gravel. Then ran pipe from under the pool (which he drilled several holes in and covered in gravel) to well point. I will have a pump there. I will also have a hydrostatic valve in the pool. But raising the pool I thinked helped the most. Should get some concrete today. So it is moving forward just little slow. My Daughter is ready for swimming now though.....


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 12th, 2011, 9:14 am 
Lifetime Supporter
Lifetime Supporter

Joined: April 29th, 2011, 6:57 am
Posts: 122
Location: Warner Robins, GA
Keep the pics coming!!! She really seems excited and ready to jump in!



_________________
16 x 32 Grecian Vinyl. Salt-Aqua Logic PS-4, Sand Filter, Hayward Ecostar SP34000vsp
Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 13th, 2011, 10:53 am 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
I am having a building set in on the right hand side of the pool it will be 8x12 with the 12 ft side running the same way the pool is. I plan to keep the pool equipment in there and was wondering if I should run a 60amp service to the building. I plan to run lights around the pool and have a reciever to some outdoor speakers as well coming from that power. I don't know of anything else that I would need power for other than that. Just wanted someones thoughts how much power is needed.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 13th, 2011, 11:06 am 
Lifetime Supporter
Lifetime Supporter
User avatar

Joined: June 28th, 2010, 11:11 am
Posts: 421
Location: Copperas Cove, Texas
Can't answer the electrical question but just wanted to say that is going to be a great pool. Keep the pics coming. :goodjob:



_________________
Mark Crook
13,500 Gallon 24' x 52" Intex Ultra Frame
Intex Sand Filter and Pump, Intex SWG (All hard PVC plumbed)
TFTestKit-100---Pool School---The Pool Calculator
Location: Copperas Cove, Texas --- My Pool Build---Useful Links for Intex Pool Owners
Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 13th, 2011, 11:55 am 
Mod Squad
Mod Squad
User avatar

Joined: June 22nd, 2009, 7:06 pm
Posts: 11125
Location: South Alabama
As with everything, you'll want more than you think. I'd say go for the 60 amp service to the building. You won't regret doing it but you might regret not doing it.



_________________
Dave J.
TFP Moderator
24' x 52" Round AGP. 1.5hp Dynamo pump. 24" Pentair Sand Dollar Filter. 45MHP2(3GPD) Peristaltic Pump
Pool School Pool Calculator TF-Test Kit
You have passed the OCLT when: 1)You lose 1ppm or less FC overnight, & 2)You have .5ppm CC's or less, & 3)your water is clear.
Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 13th, 2011, 11:57 am 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
Thanks Mark,
It isn't much compared to some on here but it is pretty big purchase for us. I think I got lucky with the PB. He really seems like a good guy and more importantly the guys he has working for him seem that way. At least so far. They have been honest and tried to be fair with us on everything. Hopefully it will continue that way.

They got the the concrete in yesterday around the anchors and some more shale and dirt in. They have ran some plumbing today and backfilled some. It is coming along. I do still need quite a bit of dirt. Told me yesterday it should be about two more weeks.


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 13th, 2011, 11:59 am 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
I am leaning toward the 60 amps. I am sure you are correct Dave. As soon as I didn't I would need it.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 23rd, 2011, 12:14 pm 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
Not much progress lately..... Weather has been bad. PB is going to have to pick up the pace a little though. I did order this today.

http://www.definitivepools.com/pool_roc ... falls.html


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 25th, 2011, 3:51 pm 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
The weather has been awful. But we have been lucky. Tornados have been all around us so I really shouldn't be complaining about delays.

With that said the PB is working on the base now and said he was going to install the liner either later today or tomorrow. Building coming Monday. Still have quite a bit left but the weather looks to be letting up after Friday.


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 26th, 2011, 12:03 pm 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
PB finished up the base last night and dropped the liner. Hose has been going all night. Hopefully weather stays Ok. But calling for big storms again tonight.


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 26th, 2011, 9:00 pm 
Mod Squad
Mod Squad
User avatar

Joined: February 23rd, 2008, 11:04 am
Posts: 3762
Location: Flower Mound, TX
Looks nice! How deep is your deep end?



_________________
TFP Moderator
10K gallon IG gunite with waterfall; Pentair CC320P filter; WhisperFlo 2 HP pump; Baracuda G3
TF Test Kits - Jason's Pool Calculator - Pool School
Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 27th, 2011, 8:26 am 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
Thanks, the deep end is 8ft. It took me about 24 hours to get it filled to the bottom step of the shallow end which is 3.5 ft. They still have to plum my waterfall stub up and get the equipment in. Then my building comes Monday so we should be able to get power either Monday or Tuesday. Then finish with backfill and the concrete guy said he hoped to be able to pour deck later next week. But rained again last night and more today. So who knows....

My work starts when they get it wraped up so I am ready to get it done. I have to build a fence then get the backyard landscaped.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: May 27th, 2011, 10:04 am 
Lifetime Supporter
Lifetime Supporter

Joined: May 4th, 2010, 7:25 pm
Posts: 133
Location: Columbus Ohio
Is your pool a 18 x 36? I am just curious :-) what size pump and filter are you going with?



_________________
16 x 32 IG Vinyl- Install- Mid June 2011. 3ft Shallow 8ft Deep/ Totally Hayward 1HP pump/ 250 pound Sand/ AquaPro800 Heat pump/ Blue Hampton Liner/ 2 Intellibrite LED Lights/ Polaris 360/ 4 Deckjet II's/ 3ft concrete Apron/ 800 sq ft Paver Patio
Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: June 6th, 2011, 2:29 pm 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
We have had good weather but progress has been slow. PB really is good guy but he needs to be more involved in day to day on my job. There has been of alot of short days and wasted time. But we are making some progress. I got my building in and I finished staining it. They did get the pool running today. More dirt to move then concrete then final grade then fence then landscape then fireplace then etc, etc, etc, ......

Anyway here are some pics....


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: June 6th, 2011, 2:30 pm 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
more...


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
 Post subject: Re: Broke ground yesterday!
PostPosted: June 6th, 2011, 2:31 pm 
Registered User

Joined: May 27th, 2010, 12:56 pm
Posts: 30
more...


You do not have the required permissions to view the files attached to this post.


Offline
 Profile  
 
Display posts from previous:  Sort by  
 Page 1 of 2 [ 30 posts ]  Go to page 1, 2  Next

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: Matt in Houston and 0 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  


TroubleFreePool.com The Web