|
It is currently February 11th, 2012, 12:49 am
|
 |
|
 |
|
| Author |
Message |
|
J24
|
Post subject: BBB - First 4 months...  Posted: February 21st, 2010, 1:42 pm |
Joined: November 2nd, 2009, 10:50 pm Posts: 19
|
|
I started on BBB 4 months ago with our new hot tub. It worked very well for us. Low maintenance, low cost, great water results. After we got the hang of it we only had to test once or twice per week. Here is where we typically kept the water:
CH 190 TA 60 Ph 7.6 CYA ~20 Borates 40 FC 2 - 6 CC .5 - 1
We would add 5 oz of regular clorox after each person/hour of soaking. We occasionally threw in 5 tsp of MPS if we had a big load of kids in the tub just to give the chlorine some help.
The water always looked, smelled and felt perfect.
In the last two months we always seemed to have a lingering .5 - 1 CC level. So yesterday, I did the recommended 100ppm decontamination procedure and drained and refilled the tub. That seemed to do the trick as I shocked it to 10ppm last night and awoke to 5.8FC and only .2CC. I am finishing the balancing today and looking forward to another 4 - 6 months of troublefree-ness. Here are the measurements:
FC 5.8 CC <.2 TA 65 CH 130 pH 7.6 CYA ~10 (estimated from dichlor addition) Borates 0
I am adding Borax and Dry Acid to get the Borates up to 40ppm to lock it all in.
Thanks to TFP and all of you for all the good advice!
Last edited by J24 on February 21st, 2010, 4:16 pm, edited 2 times in total.
|
|
|
|
 |
|
polyvue
|
Post subject: Re: BBB - First 4 months...  Posted: February 21st, 2010, 2:40 pm |
| Registered User |
 |
Joined: August 24th, 2009, 7:53 pm Posts: 1219 Location: Sacramento, California USA
|
|
4 months without draining seems pretty good to me... that's only 3 times a year with what sounds like quite a bit of use. In my portable spa days, I would drain that often or more using a Di-Chlor only regimen... low usage, and the water was not very healthy during that last month. Congratulations on mastering the tub!
_________________ 14,555 gal in-ground 16'x29' white plaster Pool w/spa (2007); Goldline Aqua Logic AQL-PS-8 control w/Aqua Cell 15 Salt Water Chlorination (SWCG); Hayward TriStar 1HP (1.85 SF) main / 1.5HP (1.60 SF) spa pumps; Hayward Swimclear cart filter C4025, ColorLogic LED lights; Tankless SP-18-4 electric heater; Polaris 280 cleaner. __ View of spiral galaxy in Ursa Major NGC6217 - Hubble Telescope 2009
|
|
|
|
 |
|
J24
|
Post subject: Re: BBB - First 4 months...  Posted: February 21st, 2010, 4:31 pm |
Joined: November 2nd, 2009, 10:50 pm Posts: 19
|
|
We probably use it 8 person hours per week. We don't shower before using it. If it's only me at night, I go "al fresco" but otherwise we wear bathing suits but we don't wash them after every soak. As we got near the 3 month mark, we had a little bit of foaming when the jets were on full and the air was on, but otherwise the foam cleared quickly. I have it set to filter 4 hours per day -- 2 hours in the am and 2 hours in the evening.
|
|
|
|
 |
|
chem geek
|
Post subject: Re: BBB - First 4 months...  Posted: February 21st, 2010, 4:40 pm |
| Special Contributor |
 |
Joined: March 28th, 2007, 2:40 pm Posts: 5208 Location: San Rafael, CA USA
|
|
So 8 person hours a week in a 355 gallon tub is a fairly high bather load. The traditional formula for water replacement interval (WRI) is as follows:
WRI (days) = (1/3) x (Spa Volume in Gallons) / (Number of Persons per Day)
The soak time is not specified but is probably assumed to be 20 minutes (certainly not more than 30 minutes). So in your case you have around 69 person-minutes per day or the equivalent of 3.4 persons per day soaking 20 minutes each. The above formula gives a WRI of 35 days. Using Dichlor-then-bleach, one usually gets double that time, so around 70 days. You're going for 4 months is truly exceptional -- probably a combination of your being more clean, possibly sweating less, and pushing the limits further than most in terms of time before water change.
_________________ 16,000 gallon outdoor in-ground 16'x32' plaster pool; Pentair Intelliflo VF pump; Pentair IntelliTouch i9+3s control system; Jandy CL-340 square foot cartridge filter 12 Fafco solar panels; Purex Triton PowerMax 250 natural gas heater (200,000 BTU/hr output); automatic electric pool safety cover; 4-wheel pressure-side "The Pool Cleaner"
|
|
|
|
 |
|
J24
|
Post subject: Re: BBB - First 4 months...  Posted: February 21st, 2010, 6:42 pm |
Joined: November 2nd, 2009, 10:50 pm Posts: 19
|
|
Wow. Great formula. Thanks.
The first fill was November 1 and I drained it yesterday so that's 112 days. I maybe overestimating the person/hours per week. I also erred on the side of adding a little more Clorox than a little less after each soak. If I thought I was in it for 45 minutes I'd round up to an hour. And, I was definitely dealing with a lingering CC level of around .5 to 1 toward the end.
I was hoping I could make this a 6 month cycle but it sounds like 3 to 4 months is more likely.
Thanks again.
|
|
|
|
 |
|
|
 |
|
 |
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot post attachments in this forum
|
|